Successful Closure of the Left Half of the B3 Arch Bridge under Lot 2 of the Georgia North-South Corridor Highway Project

2026-10-21 10:55
Successful Closure of the Left Half of the B3 Arch Bridge under Lot 2 of the Georgia North-South Corridor Highway Project
Successful Closure of the Left Half of the B3 Arch Bridge under Lot 2 of the Georgia North-South Corridor Highway Project

TBILISI, Georgia, Oct. 21, 2026 /PRNewswire/ -- On October 20, with the completion of concrete pouring for the final section of the arch ring, the left half of the B3 Arch Bridge, a key control project of Lot 2 of the Georgia North–South Corridor Road Project constructed by China Railway 23rd Bureau Group Co., Ltd., was successfully closed. The entire arch ring is expected to achieve arch closure by the end of the year. This closure marks a significant achievement in the construction of the core structural component of the largest-span cast-in-situ concrete arch bridge in the Caucasus region, laying a solid foundation for the full completion of the project and improved north–south connectivity in Georgia. It also once again demonstrates China Railway Construction Corporation's formidable capabilities and benchmark standards in overseas infrastructure development.

Successful Closure of the Left Half of the B3 Arch Bridge under Lot 2 of the Georgia North–South Corridor Highway Project
Successful Closure of the Left Half of the B3 Arch Bridge under Lot 2 of the Georgia North–South Corridor Highway Project

The B3 Arch Bridge is located deep within the Khada Gorge in the Caucasus Mountains and is a critical bottleneck-crossing project along Georgia's North–South Corridor Road Project. The B3 bridge has a total length of 437.875 meters, a clear main arch span of 286 meters, and a deck elevation 164 meters above the valley ground. It adopts a deck-type reinforced concrete arch bridge configuration with two separate box-section arch ribs and is being constructed using the cable-stayed buckling system and cantilever casting with form travellers. Construction conditions are exceptionally challenging, and the project management team has worked tirelessly to overcome numerous difficulties and technical barriers throughout the construction process. The bridge site is exposed to persistent strong winds, with winter temperatures dropping as low as -20°C and snow depths reaching up to 2 meters. The combination of extreme cold, strong winds and complex terrain places exceptionally high demands on the bridge's wind resistance, structural durability and construction accuracy. Furthermore, the arch ring has a cross-sectional width of only 3.5 meters and a height of 4.7 meters, making it the smallest in dimensions among comparable long-span arch bridges. This slender arch structure significantly increases the difficulty of cantilever casting and geometric alignment control.

To address these construction challenges, the project management team collaborated with a domestic university to conduct full-life-cycle wind tunnel tests and field verification of wind resistance, establishing a comprehensive wind-resistance monitoring and safety assurance system covering both construction and operation. Throughout construction, the project management team has strictly controlled construction methods, refined quality control procedures and precisely managed the arch ring geometry, achieving the successful closure of the left half of the arch ring with high precision. All relevant indicators comply with European design standards. Upon completion, the B3 bridge will become the largest-span reinforced concrete arch bridge in the Caucasus region, with a span ranking among the world's leading examples of comparable cantilever-cast arch bridges.

As a key hub structure along Georgia's North–South Corridor, the completed B3 Arch Bridge will eliminate a major bottleneck in north–south transport across the Caucasus Mountains, substantially reduce travel times between northern and southern Georgia, significantly improve regional road transport efficiency and traffic safety, and further enhance the local integrated transport network. The project is also a major infrastructure and public welfare initiative in Georgia and a landmark project under the Belt and Road Initiative. It will play an important role in deepening China–Georgia cooperation in infrastructure development, promoting regional economic and trade exchanges, and stimulating economic growth along the corridor. (Related: Singapore and Malaysia Lead the Largest AppliedEdu ASEAN Rankings to Date | Latest )

Moving forward, the project management team will make every effort to advance the remaining bridge construction works, maintain rigorous control over safety, quality and progress, and strive towards the target of opening the entire project to traffic. The project management team will work tirelessly to bring this world-class bridge into service as soon as possible, improving local livelihoods and injecting fresh momentum into practical China–Georgia cooperation and regional connectivity.

Latest
Her Husband Secretly Wed the Nanny: Li Yitong Drama Hooks RedNote
Arm Rewrites CPU Benchmarks for AI Agents, Claims 2x Lead Over AMD
Japan Cyber Incidents Top 2025 Tally, Trend Micro Pledges ¥10 Billion
Blackpanda and CyberCube Collaborate to Bring Cyber Risk Analytics to Brokers Across Asia
Cohesity Announces FY2026 Partner Award Winners
Homage Launches Esteem AI to Meet Surging Eldercare Demand Across Asia
AbonMax Invests NT$650 Million to Build End-to-End AI and Drone Ecosystem in Southeast Asia
Exclusive | Andy Xie Warns France Could Be the Black Swan of Q4
Patronus Biotech Receives Ethical Approval to Begin First-in-Human Phase 1 Trial of Three Multi-Stage Vaccines Against Malaria in Australia
DJI Osmo Pocket 4P Pearl White Now Available, Bringing Style to Cinematic Creators Worldwide
Jing Boran and The Early Spring: All 2026 Chinese Drama Rankings
FutureGrail Hosts Multimillion-Dollar Live Watch Auction with Previews in Hong Kong, Dubai, Geneva and Singapore
Lee Da-hye Vows to Treat 1,000 Fans if Wei Chuan Dragons Win the Title
Modernizing Firefighting with Bullard Thermal Imaging at SIDEX 2026
Japan Scraps 'China' Label on Licenses Held by Taiwanese Professionals
RISO Launches New ComColor GN Series: High-speed Inkjet Printers Delivering up to 180 ppm
Comarch Loyalty Transforms Azerbaijan Airlines' Loyalty Program into a Fintech Ecosystem
AI Agents Spark CPU Rush at TSMC as Demand Still Outruns Supply
Ready Server Launches ReadyServer LLM API, Giving Every VPS Customer Private AI Inference at No Extra Cost
Priest Killed By Falling Crucifix During Livestreamed Mass In Ecuador
Japan Police Tip Leads Microsoft to Scam Hub Behind 1 Billion Messages
Apple's iPhone Duo Sells Out in Minutes as Waits Stretch Into 2027
FICG Partners With Malaysia-Listed Cape EMS To Accelerate AI And Optical Manufacturing Expansion
Opinion | Grab Gets foodpanda Taiwan, but Uber Keeps Skin in the Game
Japan, US Put Missiles 110 km From Taiwan in Record Keen Sword Drills
Macron Vows Rioters Will Pay as France Braces for New Protests